Fixed PointENGINEERING
Concept / Simulation

AHU-01

Fixed Point Control System · v0.1 concept

Running Running Occupied Supply and extract proved
Fire alarm Healthy
E-stop Healthy
Frost stat Healthy
Refrig. leak Healthy

Supply path

Outside air
6.4°C
Fresh air damper
100%

Open · exhaust 100%

Filters · DP
PanelClean BagDirty

Bag DP above 250 Pa

Heat recovery
82%

On recovery

LTHW heating
34%
CHW / DX
0%

DX off · 0%

Supply fan
60%
Proven
Supply air
18.8°C

47% RH

Return / room

Extract fan
56%
Proven
Extract filter
Clean
Extract
21.3°C

43% RH

Room CO₂
970ppm
Room
21.5°C
Schedule
07:00–19:00

Demo hold, not a calendar

Alarms

1 unacknowledged
Unacknowledged Medium

Supply bag filter dirty

Filters · differential pressure switch · trip about 250 Pa

Raised 14:06

Setpoints

°C

Deadband 1.0 K. Heating below the band, cooling above it.

ppm

Fan speed runs from 30% to 100% as CO₂ rises 400 ppm above setpoint. Extract tracks 4% below supply.

80% RH on the supply air. Cooling is held back if it is reached.

Hand / auto / off

Auto follows the simulation. Hand holds a value. Off forces it off. A safety trip overrides hand. Overrides are logged.

Fresh air damper
100%Safety
Exhaust damper
100%Safety
Recirculation damper
0%Safety
Heat recovery
82%Safety
LTHW heating valve
34%Safety
CHW cooling valve
0%Safety
DX capacity
0%Safety
Supply fan
60%Safety
Extract fan
56%Safety
Simulate a safety trip

Opens the contact in this browser only. Fans stop, dampers close, and the alarm latches until reset. Frost also drives the heating valve to 100%.

Concept only · not for construction · Fixed Point Engineering Ltd. On a real air handler the fire alarm, emergency stop, and frost thermostat are hardwired. Contact Fixed Point Engineering from your job pack, or fixedpointengineering.co.uk.